Trade

Flooring Installation in Saskatoon

Supply and install, or install of your own materials, with the subfloor preparation that determines how the finish lasts.

Overview

Most flooring problems start below the flooring

An uneven, moving or damp subfloor will telegraph through whatever is laid over it. Preparation is the part of the job that is invisible when finished and responsible for most failures.

We assess and prepare the subfloor before installing, and we will tell you if a floor needs work you were not expecting rather than covering it and hoping.

What this solves

  • 01Existing floors are worn, damaged or moving underfoot
  • 02Levels between rooms do not meet cleanly
  • 03A renovation needs flooring coordinated with the other trades
Vinyl plank flooring part-installed

Scope

What is included

Luxury vinyl plank

Hard-wearing and water-resistant, suited to kitchens, basements and high-traffic areas.

Laminate

Cost-effective with a wide range of finishes, installed with appropriate expansion allowance.

Engineered hardwood

Real timber surface with better dimensional stability than solid in variable humidity.

Tile

Floor tile with correct substrate preparation and movement allowance.

Subfloor preparation

Levelling, securing and moisture assessment before anything is laid.

Transitions and trim

Thresholds, reducers and skirting so junctions between rooms and materials read intentionally.

Process

How the work runs

01

Assessment

We check the subfloor for level, movement and moisture before quoting.

02

Material and estimate

Recommendation based on the room and the traffic, priced in writing.

03

Preparation

Levelling and securing the subfloor. The stage that determines the result.

04

Installation

Laid, trimmed and finished, with transitions detailed.

Questions

Common questions

Either. If you supply it, we need it on site and acclimatised before installation. If we supply it, it appears in the estimate as a stated allowance.

Sometimes, depending on the existing surface and the resulting height at doors and transitions. We assess it rather than assume.

Below grade, moisture tolerance matters more than anywhere else in the house. That usually points toward vinyl or tile rather than laminate or solid timber, but it depends on your specific basement.

Flooring needs time in the room to reach the ambient temperature and humidity before installation. Skipping it is a common cause of gapping and buckling later.

Part of our trade services work

See the full range, or tell us what you are planning and we will point you to the right starting point.

Next step

Start your project with a written estimate.

Tell us what you are planning. We visit the site, agree the scope, and put an itemised price in writing.